New York Melon Bank, Major Tenant Improvements on a 4000 Square Foot Commercial Building
Partner: Kraft Construction
The necessary improvements required the gutting and rebuilding of the tenant space. The project required demolition and relocation, rerouting of complex duct work, and relocating of HVAC controls.
Project Manager, Janet Cole, said that she chose Conditioned Air because she had heard good things about them. She was particularly impressed with their ability to operate autonomously. Their high level of supervision delivered reliable performance and kept them from bothering her with any issues.
Janet told how our chief operating officer, Keith Walker, managed to obtain a required Certificate of Occupancy five minutes before Naples city offices closed so the project could be completed. As Janet summed up her experience, “Conditioned Air was absolutely professional and performed the job with no problems.”